Get a quote

Geotechnical Drilling Pontoon

Problem

Fugro approached us to provide a pontoon with spud legs that would be suitable for drilling work in Dover harbour. 

Solution

We provided a 16×6.4m Geotechnical pontoon with spud legs and welfare for the team onboard. We built an access panel into the pontoon through which the drill could access the sea bed. The spud legs allowed the pontoon to be held in position while drilling was in progress but similarly allowing it to then be relocated easily.  

Gallery

Copy of WhatsApp Image 2023-09-07 at 11.28.10
Copy of eff7a1e3-08a6-4091-bc77-fc67d3913524
Copy of 9b3d09b4-8bb7-46c8-be6b-25eb40801134
Copy of 8eb6d58c-d5da-44df-bdfc-39f7f4071da4
Copy of 2c967a52-0059-49eb-b0d4-7e82257a93b5