Floating Pontoon & Work Platform Hire Across the UK
Heavy-duty, stable, and versatile modular floating pontoons made from scaffolding — engineered to Eurocode standards and delivered ready to build anywhere in the UK.
Whether you need safe access for bridge repairs, pier inspections, or diving and UXO surveys, ScaffFloat offers modular floating scaffolding platforms that reduce mobilisation costs without compromising on safety.
- Up to 30t
- Payload
- 4m – 20m long · 2.4m – 6.4m wide
- Modular Sizing
- From 0.3m (lightship)
- Shallow Draft
- Full RAMS / Cat III
- Fully Certified
What do you need?
Two Ways to Hire a ScaffFloat Pontoon
We remain actively involved at every stage of your project to ensure structural integrity, safety compliance, and seamless execution. Whether you supply the muscle or need a completely managed marine operation, our experienced team is here to assist.
Without Operator
Pontoons operated by your crew—signed off by our experienced team.
A fully equipped, self-propelled workboat or static pontoons delivered and commissioned on site. We supervise the build, run a full operational and safety check, and complete a formal sign-off before handing control over to your certified operators.
- Best For: Projects where the pontoon is static or your team holds valid skipper qualifications.
- We Provide: A fully mobilised powered or static pontoon with all appropriate safety equipment, plus a handover inspection. If the pontoon is propelled, we provide on-the-water training and a sign-off process before we hand over the pontoon.
- You Provide: A competent, qualified, and experienced boat operator to skipper the pontoon during the hire period when self-propelled.
- Key Requirement: Pre-operation assessment and sign-off by a member of our team , plus proof of operator certification, before handover.
With Operator
Complete hands-off marine project management from start to finish.
End-to-end service where our team takes full responsibility for your floating operation. From initial CAD drawings and risk management (RAMS) to delivery, mobilisation, skippered operation, and demobilisation, we handle everything.
- Best For: Complex, high-risk, or commercial projects that require zero marine liability or labour from your team.
- We Provide: End-to-end design & RAMS, total delivery & build crew, certified skipper/marine staff, and demobilisation.
- You Provide: Site access point for transport and launch.
- Key Requirement: None—our certified Skipper and crew manage the entire marine operation on-site.
Engineered for Tough Marine & Civil Applications
-
Bridges
Bridges
We can provide a safe, stable platform under the bridge with a suitable access platform if needed, to provide access for:
- Survey and Inspection
- Scaffolding
- Maintenance
- Cutting & Welding
- Blasting & Painting
-
Diving & UXO
Diving & UXO
We can provide access to support short- to long-term diving operations. Supporting
- Surveys
- UXO
- Scour protection
- Maintenance
-
Piers & Jetties
Piers & Jetties
We specialise in providing safe floating access under piers, jetties, and other piled structures supporting:
- Blasting (Grit and UHP)
- Painting
- Pile Wrapping
- Cathodic Protection
- Welding and more
-
Harbour Walls
Harbour Walls
ScaffFloat provides the perfect stable platform to carry out works on water-facing walls in harbours, rivers, canals & ports.
- Works we have provided access for:
- Pile Wrapping
- Cathodic Protection
- Cutting & Welding
- Vegetation Removal
- Brickwork & Pointing
-
Scaffolding
Scaffolding
Floating platforms that let scaffolders build where there is no ground to build from.
- Seamless Integration with standard Scaffolding
- Rapid & Adaptive Installation
- Work Where Others Can’t
- Cost-Effective
-
Canals & Locks
Canals & Locks
We can provide access and transportation for works on:
- Locks
- Retaining walls
- Piles
- Flood protection
- Gates
- Sluices
Proven to Work: Case Studies
Suspended Pile Access – Africa
Our client in Africa needed a safe and efficient way to access and work on a long series of newly installed piles stretching from the shoreline to a jetty. The project…
Barmouth Viaduct Demolition
We were approached by Pennys group to produce a complex floating solution to help their team cut up and demolish the historic Barmouth viaduct.
Pier Maintenance – Teeside
We were asked to offer long term floating access to facilitate shot blasting of jetty piles in Tyneside.
Levens Viaduct Restoration – Ulverston
GPS MACS, working on behalf of Story Contracting and Network Rail, required marine support with the Grade II listed* Levens Viaduct in Ulverston. The viaduct, originally…
Scour Protection – Camarthen, Wales
Northern Divers required a self-propelled pontoon with a Hiab crane to support the installation of 14 x 700kg rock bags to provide scour protection to an exposed…
HMS Iron Duke & St Albans – Inclination Test – Falmouth
APCL A&P Falmouth Docks needed a stable platform for surveyors to conduct inclination tests on two Naval Frigates. This required good access to the load line markings…
HMS Prince of Wales & Queen Elizabeth – Hull Painting – Portsmouth
A project providing painters with access under the Navy’s two flagship aircraft carriers, as their bow's overhangs prevent the use of other access systems.
River Lea
GPS MACS required a floating platform with lifting capabilities that could dry out on the steep mud banks of Thames to install ladders and fendering.
Sub-sea Mattress Installation – Plymouth
Our sinking pontoon allowed ARC Marine® and Structural Evolution Ltd to install four 8t marine mattresses to cover a new seawater inlet pipe.
Suspended Platform – Barmouth Viaduct
While we were working on the removal and restoration of the Barmouth viaduct we were asked if we could offer access to the underside of the new bridge spans.
Barge Conveyor Demolition – Lincolnshire
AR Demolition required water access to demolish an old set of piles and dolphins on the upper River Trent. The structure provided moorings for visiting barges to moor…
Ironbridge – Bridge Access
We provided an 8mx6.4m powered pontoon for drilling work on a bridge at Ironbridge on the River Severnover the fast flowing River Severn.
Cleveland Bridge – Bath
Contractors needed access to the underside of the famous Cleveland Bridge with its very busy trunk road to carry out inspection and subsequent repairs.
Underside Jetty Access – East Coast, UK
We are currently working for a client on the East Coast of England who is undertaking repairs and maintenance to the underside of a jetty.
Floating Bridge Lift – Penwhapple
Beaver Bridges asked us to assist with the replacement of a footbridge at Penwhapple Reservoir in Scotland, and to install a temporary pontoon walkway for access.
Drainage Access – Tottenham, London
GPS MACS required floating access on a narrow concrete-lined drainage channel in Tottenham, London. ScaffFloat mobilised 6no 8 x 4.2m pontoons, which were moored in the…
Geotechnical Drilling Pontoon
Fugro approached us to provide a pontoon with spud legs that would be suitable for drilling work in Dover harbour.
Ferry Ramp Repairs – Southampton
GA Marine required assistance to undertake welding and replating of a roll on/roll off ferry ramp in Southampton docks that had been identified as requiring immediate…
Dive survey – Bewl Water, Kent
GPS MACS, our long-standing marine civils partner, contracted by CMDP JV for a Southern Water dive survey at Bewl Water, Kent, needed a pontoon to support their…
Ferry Ramp Replacement – Falmouth
A&P Falmouth requested our assistance to replace the rear ramps on the Irish Ferries vessel “Isles of Innisfree” while it was alongside their dock in Falmouth.
Geophysical Surveying – Scotland
Fugro needed to carry out a geophysical survey on a remote reservoir in North West Scotland with no vehicle access. They asked us for a self-propelled ScaffFloat that…
Riverside Scaffold Installation – Bath
TR Scaffolding requested a pontoon to assist with the installation and then subsequent dismantling of scaffolding on the riverside facade of the Buro Happold Building,…
Transportable ScaffFloat – Southampton
Vision Scaffolding approached to provide access under a jetty with a tight pile pattern, at short notice. It was a great opportunity to show how the smaller ScaffFloats…
Bridge Wall Survey – River Medway
The client, Soil Engineering, required a secure platform to carry out a series of dynamic probes using a terrier rig, under a bridge over the River Medway.
Scaff Barge – Guildford
We mobilised 8m x 4m pontoon with over 3.5t payload capacity to carry materials and give access to a remote bridge on the River Tillingbourne.
Diving pontoon
Northern Divers approached us to assist with UXO works in Great Yarmouth so we supplied a self-propelled 16 x 6.4m pontoon with skipper.
Bridge Scaffolding Installation – River Lee
MR Scaffolding needed a reliable platform to support the mobilisation and subsequent demobilisation of fixed scaffolding beneath the River Lee Bridge in North London.
Equipment Transport – Cornwall
As part of a planned redevelopment of the southern shore of the lake (which is only accessible by water) the CST needed to transport approx. 50 tonnes of plant,…
Felixstowe Dolphins
KML were contracted to remove an old dolphin, so we were asked to provide pontoon to fit in around the tight pile pattern and give 360° acces to the pile.
Bridge Maintenance – March Town
Volker Laser required floating access to support a 10-week program of bridge maintenance work on the March Town Bridge.
Campaign Pontoon – Thames, London
A client we provided a protest pontoon for at the COP26 summit a few years ago came to us a few weeks ago and asked us to help with a campaign on the Thames.
Jetty Maintenance – River Tees
Sub Aqua Diving Service required a pontoon to access the underside of a jetty, on the River Tees, for inspection and routine maintenance.
Marine Oil Spill Response training – Falmouth
APCL A&P Falmouth used an 8x4m self-propelled workboat, which was already on hire, to conduct water-based Marine Oil Spill Response training, approved by the…
Demolition Support, Birmingham
AR Demolition was demolishing an industrial building next to a busy canal in Birmingham. They required a pontoon to provide catchment for any stray material that would…
50m pipe pontoon – River Thames
Working for GPS MACS we mobilised 50m of pontoon with a central gutter to hold a 200mm concrete pipe running from the shore to a jack-up barge.
Barking Power Station Decommissioning
GPS MACS requested floating access to assist with the decommissioning of the outfall pipe structure at Barking Power Station.
Workboat duties – APCL A&P Falmouth
We were requested by APCL A&P Falmouth to provide a workboat to support duties including access, moving fenders, push towing pontoons and barges, and assisting with…
Scaffolding Installation Support – Doncaster
Attridge Scaffolding, our long-standing scaffolding partner, needed a reliable floating platform to install a hanging scaffold beneath the Doncaster Rail Bridge.
Bridge Inspection – Alfriston
A good example of "build-your-own" floating access. Scaffolding Ltd needed access for one of their clients to carry out an inspection and repairs on the remote and tidal…
Fixed Walkway – St Mawes, Cornwall
A private resident in St Mawes, Falmouth, needed a temporary, high-quality fixed walkway built for the summer season. The walkway needed to provide easy access from…
Bridge Repairs – River Lee
We mobbed an 8x4m self-propelled ScaffFloat pontoon with 60hp high thrust outboard engine, loaded 2t of scaffolding on the pontoon.
Blackwall Yard River Wall Repair
GPS MACS approached us to provide a pontoon with a monkey tower for some river wall repairs on the River Thames in London.
Scaffold Tower Installation – Reading
Attridge Scaffolding, our long-standing partner, wanted to erect a scaffold tower on a ScaffFloat to install anti-climb measures on Gasworks Road Bridge, which spans the…
Floating LED Screen – LIV Golf Tour UK
Arena Group approached us to provide a pontoon for a mid-lake LED screen at the prestigious JCB Golf Course in Uttoxeter, which was hosting the LIV Golf Tour for the…
Safety Support Boat – Padstow
Edwards Diving Services required safety boat support for an underwater survey at Padstow Lifeboat Station located 3.5 miles west of the Padstow harbour entrance. This…
Ferry Ramp Installation
A&P Docks in Falmouth wanted a solution to install new ramps to the Stena Europe who was alongside for an extensive on the water refit.
Windsor Pipe Bridge Demolition
Pennys Group required a safe and stable work platform in Bath to cut up the Windsor pipe bridge structure from the underside and then be remove it completely.
HMNB Devonport – Thanckes Oil Fuel Jetty
Volker Stevin were asked to build a new fuel jetty in Plymouth, and demolish the old one. This brought unique floating access requirements and challenges.
Denton Wharf
A 16 x 6.4m ScaffFloat carrying a full diving spread was mobilised for a diving project, providing cathodic protection for the Port of London Authority.
Eel Screen Lifting – River Severn
The contracting water authority needed to fit a new eel screen solution at their water treatment plant on the upper River Severn.
Dredging Pontoon
Lutra Marine Limited requested a pontoon suitable for a 9t WM long reach excavator for dredging on the canal in Bude with their innovative new cutter head.
Falmouth Boat Yard – Boat Hoist
Falmouth Boat yard boat hoist was taken out of service at one of their busiest times of year but another local yard offered them the use of their hoist.
Self Propelled Moon pool
The client requested a self-propelled ScaffFloat for a special project in the UK so we provided a 14m x 6.4m pontoon with moon pool and 5t gantry
Hamms Hall Bridge Demolition
AR Demolition requested a suitable and safe pontoon for heavy equipment to operate on over water to help with the demolition of a bridge over the River Tame.
Attridge Scaffolding – Chetwynd 5
We worked with Attridge Scaffolding for the fifth time on Chetwynd Bridge and this time we also provided our own rescue cover at the start and end of the job.
Tree Removal – Bath
Edwards Diving contacted us about building a crane pontoon in Bath to act as a base for a team of divers and assist with the removal of trees from the water.
Half Penny Bridge
For the replacement of the rail on top of the bridge and to add a walkway, Attridge scaffolding needed our assistance to catch any falling debris.
Bedford Lock
We mobilised a 6.0 x 2.9m pontoon which was designed specifically to fit just inside the lock for repair works on the Great Ouse river.
Torpoint Electrical Works
Volker Stevin was contacted to arrange access to change a defective light under the jetty head in Torpoint. We mobilised a pontoon with inset handrails and foam sides.
Northern Scotland – Bridge Inspection
i-Scaff Access solutions required a safe and stable platform for a team of workers to carry out a bridge inspection in the north of Scotland.
Loddon Crossing
Attridge Scaffolding required access to a pipe situated underneath a utility bridge which needed cladding removed from it.
Access – Cutters Bridge, Ely
Attridge Scaffolding, working in partnership with Balfour Beatty, needed to gain access to a bridge and remain manoeuvrable in a navigable and busy water course.
Thrapston Bridge
Goldhawk needed non-permanent, water-level access to carry out bridge strengthening works on Thrapston Bridge while the waterway could be kept open.
Chetwynd Bridge
The local authority needed to inspect a busy road bridge for excessive movement over the fast flowing and very shallow River Tame.
Utility Bridge Demolition
To remove a utility bridge across the river Tame, we assisted scaffolding contractor with erecting scaffolding to the underside of the bridge.
EA – Hilgay
We mobilised a 24m long ScaffFloat pontoon for a project in Hilgay involving the Environment Agency and SRT Scaffolding.
Neath Swing Bridge
An 8x4m ScaffFloat pontoon attached to the shore was provided for access to scaffold and carry out repairs on the Neath Swing Bridge in Wales.
UXO – Liverpool
We supported two UXO dive companies to survey and remove potential unexploded ordnance from Liverpool’s Bramley Moore Docks.
Millennium Stadium
This simple solution allowed the entire job, including removing all old cabling to shore and the fitting of new cabling to be completed considerably ahead of schedule.
TV/Film Floating Access – 6 x 4m pontoon
Focus Marine approached us about using ScaffFloat's pontoons as a floating access solution for the tv/film industry on various projects that they are involved in.
River Cam – Cambridge
Attridge Scaffolding were asked to build a crash deck under a bridge in Cambridge. This was needed for repair works by Balfour Betty for Network Rail.
DVD – UTAC Milbrook – Military Event
We mobilised a pontoon for a vehicle manufacturer who were exhibiting one of their vehicles at a defence tradeshow.
Railway bridge – Camden
The client needed to access the underside of a steel rail bridge, and the abutment wall. The bridge ran over a canal and a bank had built up on the abutment.
Canvey Island
A ScaffFloat was used to carry out a concrete survey under pier heads with a very tight pier pattern, wash from passing vessels and a rising and falling tide.
Hideaway Spaces
Mark Sorrill from Hideaway approached us to create the perfect base for a photoshoot in Cawsand bay, Plymouth to launch their NEW Burt
Sauna Pontoon
A local sauna manufacturer wanted to hire a pontoon to put a sauna on for a photo shoot so we provided an 8m x 4m Scaffloat that could be towed anywhere.
Brownhill lock
We designed a 16x3.7m ScaffFloat Barge to transport 15t of scaffolding to a remote lock site so a civil engineering firm could carry out maintenance works.
Little Ouse River
Attridge Scaffolding, one of our Approved ScaffFloat Partners, were asked to install a suspended scaffold under a remote rail bridge over the Little Ouse river.
Floating Canal Welfare
Martin Childs LTD has been using ScaffFloats since late 2021. While working on canals there is a need for a welfare unit where normally access would be a problem.
Dog in a Doublet Lock
We supplied an 8m x 4m pontoon for XL Scaffolding who required a pontoon specifically to fit inside the lock near the Dog in a Doublet restaurant, Peterborough.
Canal Gate Repair
This 8.0 x 3.7m pontoon is specifically designed to get through common lock gate widths and was used here to transport equipment from the locks to the marinas.
Concrete repairs – Perth
Elite Concrete Protection and Repairs in Perth, Western Australia, needed a very stable platform to carry out concrete repairs from under a pier.
ScaffFloat Drydock
Using the ScaffFloat system to develop a dry dock to lift vessels and other heavy items up from the seabed and/or out of the water.
Tree removal
A large oak tree had fallen into the river next to a busy ferry landing and was blocking navigation. The tree surgeon worked from an 8m x 4m ScaffFloat pontoon.
Beggars Bridge
Access was required underneath a railway bridge for a simple and brief job to touch up some of the exposed steelwork with fresh paint.
UXO – Stolthaven Terminal
Conducting UXO investigations prior to works on the Stolthaven Marine terminal; this pontoon is the third diving pontoon provided to Dagger Diving during 2021.
Crossways & Network Rail
Network Rail needed to effect repairs to a mainline bridge over the River so we provided an 8m x 4m Scafffloat with a 50Hp engine and 3 tonne payload.
Oil Spill
An oil tanker went over a cliff onto a beach and as the oil clean up was on an exposed beach, the client needed a pontoon to float in plant and equipment.
Floating Christmas Tree
For the holiday season in Falmouth, Cornwall, we built and deployed a ScaffFloat pontoon in the middle of the river to display a lit up Christmas tree.
Floating Sea Shanties
We provided a ScaffFloat pontoon to the Oggymen, a local sea shanty group who sang from various locations around the Falmouth waterfront during the G7.
COP 26 Demonstration
This bespoke pontoon was designed specifically to float ‘slightly under the water’ for the COP26 protesters, to have an ankle-deep stage to demonstrate upon.
G7 Demonstration
This pontoon was designed to transport the two bespoke inflatable ‘blimp’ style demonstrations during the G7 talks held in Cornwall.
No case studies match those filters yet. Show all
What our clients say
A Post-tensioned Special Inspection that we were delighted to undertake earlier this year. Our clients, which run a petrochemical storage facility, needed confirmation that their asset was not at risk of sudden structural failure. Thanks to Toby Budd of ScaffFloat and Skipper Joe for all their help with access on this challenging project.
"The whole experience of using this - this has been the first time we’ve used it - has been superb and I would certainly recommend the services to anybody else that needs it."
Chris Price, Centregreat Engineering, Electrician at Centregreat"An impressive piece of kit, we are planning to have it back later this year.”
Keynvor MorliftNeed a Floating Pontoon Quote for an Upcoming Project?
Fill out this short form and let us know where, when, and how big. We will get back to you within 1 working day to discuss your requirements.