ScaffFloat pontoon with raised platform on the river Cam

River Cam – Cambridge

PROBLEM
Attridge Scaffolding were asked to build a crash deck under a bridge in Cambridge. This was needed for repair works being carried out by Balfour Betty for Network Rail.The river is heavily used by rowers and pleasure craft so it was not an option to close the waterway.

SOLUTION
– We mobbed an 8m x 4m ScaffFloat with spud legs to hold it in position under the bridge, a small 15hp outboard to position it and a skipper to operate it and warn oncoming traffic.
– Scaffolders loaded the pontoon with scaffold and then worked from the pontoon to install the scaffold. This saved significant time for the client.

Gallery

ScaffFloat pontoon with raised platform on the river Cam
ScaffFloat transporting scaffboards through a lock on the river Cam in Cambridgeshire
ScaffFloat launch on the River Cam, Cambridge
ScaffFloat being built on the quayside, river Cam, Cambridge
River Cam pontoon with stacks of scaffolding board