Get a quote
A scafffloat hosited up under a jetty in Africa to support inspection and maintence.

Suspended Pile Access – Africa

Our client in Africa needed a safe and efficient way to access and work on a long series of newly installed piles stretching from the shoreline to a jetty. The project required workers to have 360-degree access to each pile for maintenance, and the solution had to be easily repositioned to over 100 different locations.

The Challenge

Our client in Africa needed a safe and efficient way to access and work on a long series of newly installed piles stretching from the shoreline to a jetty. The project required workers to have 360-degree access to each pile for maintenance, and the solution had to be easily repositioned to over 100 different locations.

The Solution

We designed and built two custom 8m x 3m self-propelled ScaffFloats to solve the client’s access problem. We engineered these unique units to be hoisted and secured on either side of the piles.

Once in position, workers placed staging boards across the gap to create a stable and secure work platform. This system was critical for the project’s efficiency, as the ScaffFloats could be lowered, moved, and re-hoisted in just a few hours.

The hoisting system was carefully designed to be both secure and adjustable. The ScaffFloats were lifted from the bottom chord of the jetty pier using primary chain hoists and then held firmly in place with a secondary set of hoists.

Key Deliverables & Preparation

To ensure the project’s success, we provided a comprehensive package that included:

  • Detailed engineering drawings.
  • A full lift plan and methodology.
  • All necessary lifting gear.
  • A Cat 3 Check from Richter to verify the structural integrity.

Before shipping the units, we pre-built and tested them at our yard in Cornwall. We conducted a full trial of the hoisting system with a simulated load on the deck. Because the narrow pontoons fall outside our standard stability assessment criteria, we also performed a series of sea trials in Falmouth, including an inclination test verified by a local marine surveyor.

Logistics & On-site Support

The entire solution, including all pontoons and equipment, was carefully packed into a container and shipped directly from our yard in Cornwall to the project site in Africa.

Upon arrival, a member of our team was deployed to Africa to oversee the assembly of the ScaffFloats, conduct final trials, and provide a full handover to the client. This on-site support was crucial for ensuring the project got off to a smooth start.

Gallery

Hoisted ScaffFloat Africa

Related case studies