Get a quote

Case Studies

Search

Suspended Pile Access – Africa

Our client in Africa needed a safe and efficient way to access and work on a long series of newly installed piles stretching from the shoreline to a jetty. The project required workers to have 360-degree access to each pile for maintenance, and the solution had to be easily repositioned to over 100…

Demolition Support, Birmingham

AR Demolition was demolishing an industrial building next to a busy canal in Birmingham. They required a pontoon to provide catchment for any stray material that would otherwise fall into the busy waterway, as well as access to the water facing elevation of the building.

Windsor Pipe Bridge Demolition

Pennys Group required a safe and stable work platform in Bath to cut up the Windsor pipe bridge structure from the underside and then be remove it completely.  

Hamms Hall Bridge Demolition

AR Demolition requested a suitable and safe pontoon for heavy equipment to operate on over water to help with the demolition of a bridge over the River Tame.

Utility Bridge Demolition

To remove a utility bridge across the river Tame, we assisted scaffolding contractor with erecting scaffolding to the underside of the bridge.