Soil engineering dynamic probing on the river medway. Pushing on to the bridge wall.

Bridge Wall Survey – River Medway

Problem

Soil Engineering required a stable platform to carry out a series of dynamic probes using a terrier rig. The works had to take place under a bridge that crossed the River Medway, with no means of securing or mooring the pontoon. They required the probes to be taken the width of the bridge span and at least 1 metre away from the abutment. 

Solution 

We mobilised an 8m x 4m self propelled pontoon with 2 x high thrust 60hp engines and a built-in recess to facilitate the terrier rig work on the river bed, 1 metre away from the bridge abutment. We also supplied a skipper and welfare facilities to ensure the safety and comfort of the team. 

The skipper held the ScaffFloat in position by powering onto the wall using the engines. This allowed the ScaffFloat to be moved dynamically into position for each individual probe and allowed the ScaffFloat to also counter the effect of the considerable tides that the project experienced. In order to counter the weight of the terrier rig additional moving ballast was also provided. While we allowed for three days to carry out this project we were able to complete all that was needed in one day.

Related case studies