River Lea
PROBLEM
GPS MACS, a specialist marine contractor, required a floating platform with lifting capabilities for a project on the Thames to install ladders, chains and wooden fendering. The contractor was limited by water depth and needed something that could dry out on the steep mud banks of the river to maximise tidal working windows over a two-month period.
SOLUTION
– An 8m x 6.4m ScaffFloat, fitted with two 60hp, high-thrust outboards giving 0.8t of bollard pull and a 5-knot service speed with a draft of only 0.3m and the ability to ground out.
– A comfortable 3t payload on the large open 50m² wood deck.
– A 2.8tm crane that can lift 600kg at 5m was fitted to a custom-made steel crane base.
– The ScaffFloat and crane were Lloyd’s registered, NDT tested and LOLER tested and a full stability assessment was provided in line with relevant IMO (International Maritime Organization) standards.