Barmouth Viaduct Demolition

We were approached by Pennys group to produce a complex floating solution to help their team cut up and demolish the historic Barmouth viaduct.

Scour Protection – Camarthen, Wales

Northern Divers required a self-propelled pontoon with a Hiab crane to support the installation of 14 x 700kg rock bags to provide scour protection to an exposed pipeline in the River Towy near Carmarthen.  

River Lea

GPS MACS required a floating platform with lifting capabilities that could dry out on the steep mud banks of Thames to install ladders and fendering.

Barge Conveyor Demolition – Lincolnshire

AR Demolition required water access to demolish an old set of piles and dolphins on the upper River Trent. The structure provided moorings for visiting barges to moor to, along with support for a conveyor that ran from the quarry.

Floating Bridge Lift – Penwhapple

Beaver Bridges asked us to assist with the replacement of a footbridge at Penwhapple Reservoir in Scotland, and to install a temporary pontoon walkway for access.

Self Propelled Moon pool

The client requested a self-propelled ScaffFloat for a special project in the UK so we provided a 14m x 6.4m pontoon with moon pool and 5t gantry

Tree Removal – Bath

Edwards Diving contacted us about building a crane pontoon in Bath to act as a base for a team of divers and assist with the removal of trees from the water.

ScaffFloat Drydock

Using the ScaffFloat system to develop a dry dock to lift vessels and other heavy items up from the seabed and/or out of the water.