Torpoint Electrical Works
Problem
Volker Stevin was contacted to arrange access to change a defective light under the jetty head in Torpoint. They then approached us to provide support to enable them to do this.
Solution
We mobilised an 8 x 3 pontoon with inset handrails and foam sides. The size and shape of the pontoon made it the ideal size and shape for transporting by road. This was all mobilised swiftly in our yard and then transported on the back of a HIAB truck up to the site location. No specialty experience was required for launching the pontoon. We also provided a monkey tower to assist with ease of access to the light that needed fixing.