Suspended Pile Access – Africa

Our client in Africa needed a safe and efficient way to access and work on a long series of newly installed piles stretching from the shoreline to a jetty. The project required workers to have 360-degree access to each pile for maintenance, and the solution had to be easily repositioned to over 100…

Barmouth Viaduct Demolition

We were approached by Pennys group to produce a complex floating solution to help their team cut up and demolish the historic Barmouth viaduct.

Levens Viaduct Restoration – Ulverston

GPS MACS, working on behalf of Story Contracting and Network Rail, required marine support with the Grade II listed* Levens Viaduct in Ulverston. The viaduct, originally built in 1857, comprises 49 similar spans, with the piers constructed on a concrete apron which required extensive restoration

River Lea

GPS MACS required a floating platform with lifting capabilities that could dry out on the steep mud banks of Thames to install ladders and fendering.

Ironbridge – Bridge Access

We provided an 8mx6.4m powered pontoon for drilling work on a bridge at Ironbridge on the River Severnover the fast flowing River Severn.

Floating Bridge Lift – Penwhapple

Beaver Bridges asked us to assist with the replacement of a footbridge at Penwhapple Reservoir in Scotland, and to install a temporary pontoon walkway for access.

Ferry Ramp Replacement – Falmouth

A&P Falmouth requested our assistance to replace the rear ramps on the Irish Ferries vessel “Isles of Innisfree” while it was alongside their dock in Falmouth.

Transportable ScaffFloat – Southampton

Vision Scaffolding approached to provide access under a jetty with a tight pile pattern, at short notice. It was a great opportunity to show how the smaller ScaffFloats can be transported to site fully made.

Equipment Transport – Cornwall

As part of a planned redevelopment of the southern shore of the lake (which is only accessible by water) the CST needed to transport approx. 50 tonnes of plant, machinery, and building materials across the lake.

Felixstowe Dolphins

KML were contracted to remove an old dolphin, so we were asked to provide pontoon to fit in around the tight pile pattern and give 360° acces to the pile.

Jetty Maintenance – River Tees

Sub Aqua Diving Service required a pontoon to access the underside of a jetty, on the River Tees, for inspection and routine maintenance.

50m pipe pontoon – River Thames

Working for GPS MACS we mobilised 50m of pontoon with a central gutter to hold a 200mm concrete pipe running from the shore to a jack-up barge.

Windsor Pipe Bridge Demolition

Pennys Group required a safe and stable work platform in Bath to cut up the Windsor pipe bridge structure from the underside and then be remove it completely.  

Denton Wharf

A 16 x 6.4m ScaffFloat carrying a full diving spread was mobilised for a diving project, providing cathodic protection for the Port of London Authority.

Dredging Pontoon

Lutra Marine Limited requested a pontoon suitable for a 9t WM long reach excavator for dredging on the canal in Bude with their innovative new cutter head.

Falmouth Boat Yard – Boat Hoist

Falmouth Boat yard boat hoist was taken out of service at one of their busiest times of year but another local yard offered them the use of their hoist.

Hamms Hall Bridge Demolition

AR Demolition requested a suitable and safe pontoon for heavy equipment to operate on over water to help with the demolition of a bridge over the River Tame.

Bedford Lock

We mobilised a 6.0 x 2.9m pontoon which was designed specifically to fit just inside the lock for repair works on the Great Ouse river.

Torpoint Electrical Works

Volker Stevin was contacted to arrange access to change a defective light under the jetty head in Torpoint. We mobilised a pontoon with inset handrails and foam sides.

Thrapston Bridge

Goldhawk needed non-permanent, water-level access to carry out bridge strengthening works on Thrapston Bridge while the waterway could be kept open.

Chetwynd Bridge

The local authority needed to inspect a busy road bridge for excessive movement over the fast flowing and very shallow River Tame.

Utility Bridge Demolition

To remove a utility bridge across the river Tame, we assisted scaffolding contractor with erecting scaffolding to the underside of the bridge.

EA – Hilgay

We mobilised a 24m long ScaffFloat pontoon for a project in Hilgay involving the Environment Agency and SRT Scaffolding.

Neath Swing Bridge

An 8x4m ScaffFloat pontoon attached to the shore was provided for access to scaffold and carry out repairs on the Neath Swing Bridge in Wales.

Millennium Stadium

This simple solution allowed the entire job, including removing all old cabling to shore and the fitting of new cabling to be completed considerably ahead of schedule.

Railway bridge – Camden

The client needed to access the underside of a steel rail bridge, and the abutment wall. The bridge ran over a canal and a bank had built up on the abutment.

Canvey Island

A ScaffFloat was used to carry out a concrete survey under pier heads with a very tight pier pattern, wash from passing vessels and a rising and falling tide.

Floating Canal Welfare

Martin Childs LTD has been using ScaffFloats since late 2021. While working on canals there is a need for a welfare unit where normally access would be a problem.

Canal Gate Repair

This 8.0 x 3.7m pontoon is specifically designed to get through common lock gate widths and was used here to transport equipment from the locks to the marinas.

Concrete repairs – Perth

Elite Concrete Protection and Repairs in Perth, Western Australia, needed a very stable platform to carry out concrete repairs from under a pier.

ScaffFloat Drydock

Using the ScaffFloat system to develop a dry dock to lift vessels and other heavy items up from the seabed and/or out of the water.

Tree removal

A large oak tree had fallen into the river next to a busy ferry landing and was blocking navigation. The tree surgeon worked from an 8m x 4m ScaffFloat pontoon.

Beggars Bridge

Access was required underneath a railway bridge for a simple and brief job to touch up some of the exposed steelwork with fresh paint.

Oil Spill

An oil tanker went over a cliff onto a beach and as the oil clean up was on an exposed beach, the client needed a pontoon to float in plant and equipment.