Felixstowe Dolphins
PROBLEM
— KML were contracted to remove an old dolphin at the port, this involved cutting the old piles before lifting them out. The initial plastic pontoon they hired was too wobbly underfoot, so we were asked to provide a more stable pontoon that would fit in around the tight pile pattern and give 360 acces to the pile.
SOLUTION
— We designed a horseshoe shaped 4m x 4m ScaffFloat with a drop down deck that bridged the pile recess once it was in position, this gave full walk around access.
— It was fitted with full handrails and kickboards compliant to TG20 and a boarded deck suitable for hot works.
— The inside of the recess was boarded, so once the steel gate was closed behind the pile it would just slide up and down on the tide.
“An impressive piece of kit, we are planning to have it back later this year.”
– Keynvor Morlift