Ferry Ramp Replacement – Falmouth
Problem
A&P Falmouth requested our assistance to replace the rear ramps on the Irish Ferries vessel “Isles of Innisfree” while it was alongside their dock in Falmouth. They needed to support the ramps while wires and hydraulics were replaced, and to give floating access to the underside of the ramps and rear of the ship.
Solution
We mobilised our largest pontoon system, the SF750, 16m x 6.4m ScaffFloat pontoon with a maximum payload of 30 tonnes, along with a self-propelled SF450 8m x 6.4m ScaffFloat.
The larger pontoon had a 20ft container placed on the deck to support the ferry ramp at the correct height. The ScaffFloat was secured in position with anchors and lines connected to both the dock and the ferry. If repositioning was necessary, we utilised our 8m x 6.4m self-propelled workboat.
For access we provided a Monkey Tower (adjustable podium steps) as well as a MEWP, to give access from deck level up to 9m above the waterline.
Gallery