Loading a ScaffFloat pontoon for a railway bridge project in Neath

Neath Swing Bridge

Problem 

Centregreat Rail was contracted by Network Rail to erect a scaffold on the famous Neath Swing Bridge in Wales and carry out a schedule of planned work. They approached us to provide a floating solution that provided access back and forth across the river and access to the underside of the structure at high tide to allow them to install scaffold.

Solution 

ScaffFloat mobilised a walkway pontoon attached to the shore, along with a mooring system, to facilitate all-tide access to the river. In addition we mobilised a self-propelled 8m x 4m workboat with a single high thrust engine to act as a floating bridge and move contractors and equipment back and forth across the river and to the underside of the bridge. This long running project always had a qualified skipper on site to ensure the safety of the team and the ScaffFloat.

Gallery

Centregreat Neath
Scaffloat pontoon with access ramp and shelter under Neath swing bridge
Scaffloat pontoon with access ramp under Neath swing bridge

Related case studies