Windsor Pipe Bridge Demolition

Problem

Pennys Group required a pontoon to carry out the removal of the Windsor pipe bridge in Bath. They required a safe and stable work pontoon which allowed them to cut up the bridge structure from the underside and then be removed completely.  

Solution 

 We mobilised a 12m x 6.4m ScaffFloat that had a 3t payload which was moved as necessary using ropes. In order to obtain the height they needed to access the underside of the bridge TRS Group erected a Haki platform that could be altered as required depending on the stage of the project.