Problem
Attridge needed to do drilling work on a bridge at Ironbridge on the River Severn. This area of the River Severn is very prone to flooding and fast flowing.
Solution
We provided an 8mx6.4m powered pontoon with a skipper. Attridge built and certified a tower on the pontoon to be able to reach the underside of the bridge for their drilling works.
We kept a skipper on standby over the weekends to regularly check the pontoon and river flow/levels.