Loddon Crossing
Problem
Attridge Scaffolding required access to a pipe situated underneath a utility bridge which needed cladding removed from it.
To do this they needed a stable and secure platform to support a scaffold tower which would be used by Network Rail workers to access the pipe and safely remove the cladding. A skipper would also be required to position the pontoon and to provide access to workers back and forth across the river.
Solution
We mobilised a self propelled 8 x 4 pontoon with a 50hp outboard with safety pack and skipper. It acted as a base for Attridge Scaffolding to construct a temporary scaffold tower which allowed access to the pipe to carry out the required work.