Problem

Attridge Scaffolding required access to a pipe situated underneath a utility bridge which needed cladding removed from it. 

To do this they needed a stable and secure platform to support a scaffold tower which would be used by Network Rail workers to access the pipe and safely remove the cladding. A skipper would also be required to position the pontoon and to provide access to workers back and forth across the river.

Solution

We mobilised a self propelled 8 x 4 pontoon with a 50hp outboard with safety pack and skipper. It acted as a base for Attridge Scaffolding to construct a temporary scaffold tower which allowed access to the pipe to carry out the required work.

Gallery

A stable platform for a scaffolding tower to be constructed to carry out the work
two workers in safety PPE observing third person climbing up scaffolding tower up towards the underside of the bridge.
WhatsApp Image 2023-02-28 at 16.51.25 (1) (1)
WhatsApp Image 2023-02-28 at 16.51.26 (1) (1)

Related case studies