Problem
PMA Scaffolding Ltd needed access for one of their clients to carry out an inspection and repairs on the remote and tidal Frog Firle Bridge, Alfriston.
Solution
There was no propulsion or skipper needed, and PMA Scaffolding Ltd were able to use their own scaffolding, so we shipped the floats along with a comprehensive set of instructions to construct a 6 x 4 meter pontoon, and PMA scaffolding ltd did the rest.
A good example of “build-your-own” floating access. As part of their hire package we sent out general arrangement drawings, one page build guide, side & top view plans and pontoon spec sheet along with bill of materials and lifting guide. A safety board was also included in the pack to ensure all the safe working guidelines were visibly documented to everyone working on the project.
We received a nice testimonial from PMA Director Peter Manley:
“ScaffFloat is a new system to our scaffolding business. After some research we felt it was the right solution to carry out our customer’s planned bridge works over the river Cuckmere. When accounting for tides and the different works being completed the pontoon was versatile and stable enough to move to various placements under the bridge itself. Overall, a great solution to a very real access problem!
The pontoon itself was easy to assemble with the scaffolding equipment we had in stock and a small team. The communication from the initial contact to design and delivery has been excellent.
We’re looking forward to using ScaffFloat again in the future!”


