The scaffold industry has very strict and regular inspections on its structures, after all, if they fail, the consequences are very serious.
Whilst the risk and outcomes for a structural failure on a ScaffFloat™ are significantly lower, all our pontoons are inspected every seven days, or after any event likely to have affected the structure. Like the scaffold industry, the responsibility for this 7-day inspection is with the contractor/user. We provide a thorough and easy to follow checklist for each pontoon we hire out and guidance on how to do the inspection.








