Bridge Jacking Frame

We have designed and fabricated this modular bridge jacking frame for installing or removing bridges over water.

The main structure is profiled and folded 6-8mm plate, with no welding, which means it can be adapted and extended if needed.

The base frame bolts together in under half an hour, while the movable components are all secured on chunky pins.

The width and height can be adjusted to match the bridge that needs to be lifted.

The frame is taller than the bridge, so the base frame is assembled first on the pontoon deck, with the uprights hinged out onto the deck. Once under the bridge and in position, these are hinged upright with mechanical assistance, and once vertical, locked off with pins.

Push-pull props are then used to brace the uprights, as well as ratchet strap stays out to the edges of the pontoon.

Once the vertical slider sections are in place on either side of the bridge we install a pair of horizontal lifting beams underneath. The upper beam sits under the bridge deck or bottom chord, and the lower beam sits on pins around 100mm underneath. Hand bottle jacks are then used to jack up the bridge, resetting and lifting the lower beam every 150mm. Slow but very controlled and simple.

A pair of these spec frames can lift 50t.

Water ballast on the deck can be used on deck if the pontoon is offset and we are not able to sit directly under the CoG of the bridge.

Cat 3 check from Richter with suitable DAF and environmental limits.

All this will sit on one of our larger SF750 pontoons made with our larger 1m3 floats and 750mm scaffold lattice beams.

Photo showing it being used recently on a project for Beaver Bridges Ltd and George Leslie Ltd in Scotland