ScaffFloat in Barmouth
We mobilised on the beach, building 4 heavy lift pontoons, 12m x 8m with 63 large floats giving 63m3 or 63t of buoyancy. These where built with 750mm Layher Ltd (UK) beams from George Roberts Ltd with the rest of the scaffold and had help to build them from our partners J.F.E. Attridge(Scaffolding Services) Co. Limited.
To push/ tow them around we have two ScaffFloat Workboats, an 8m x 4m with 2 x high thrust Yamaha outboards giving 0.8t bollard pull, and a larger 8m x 6.4m with 2 x high thrust Yamaha 100hp outboards giving 1.5t bollard pull.
We have laid a spread of anchors either side of the bridge, and use deck winches attached to the anchors and bridge piers to hold us in position under the bridge to a tolerance of 100mm.
The big challenge here is weather and tide giving us small windows around slack water to perform the lifts.
So far we have one span, the swing span complete, and now start on the fixed span.