ScaffFloat in Barmouth

We are currently working in Barmouth, North Wales for Pennys Group who are involved in the demolishing and cutting up of the old Barmouth Railway Viaduct for Alun Griffiths (Contractors) Ltd and Network Rail. Our team has mobbed over 500m2 of floating scaffold.  Our role is to catch the bridge sections when they are lowered down and tow them to the beach to dry out for demolition.

We mobilised on the beach, building 4 heavy lift pontoons, 12m x 8m with 63 large floats giving 63m3 or 63t of buoyancy. These where built with 750mm Layher Ltd (UK) beams from George Roberts Ltd with the rest of the scaffold and had help to build them from our partners J.F.E. Attridge(Scaffolding Services) Co. Limited.

To push/ tow them around we have two ScaffFloat Workboats, an 8m x 4m with 2 x high thrust Yamaha outboards giving 0.8t bollard pull, and a larger 8m x 6.4m with 2 x high thrust Yamaha 100hp outboards giving 1.5t bollard pull.

We have laid a spread of anchors either side of the bridge, and use deck winches attached to the anchors and bridge piers to hold us in position under the bridge to a tolerance of 100mm.

The big challenge here is weather and tide giving us small windows around slack water to perform the lifts.

So far we have one span, the swing span complete, and now start on the fixed span.

Thanks to Simon Roberts, Dominic Varcher and Gareth Yates for the photos.

Gallery

1694626664393
1694626537133
1694872553782
1694872544716
1694872544678
1694872547763
1695072704319
1695072698839
1695072706754
1695072703984
1694872547517
1694872547322
1694872547482
1695072696258
1695072676989
1694872556608
1695651366888
1695651364513
1695651356643
1695651358557
1695651361588
1695651367044
Credit Mullholland Media
Credit Mullholland Media
Credit Mullholland Media
Screenshot 2023-11-21 15.10.49
Screenshot 2023-11-21 15.09.19
Barmouth Viaduct completion December 2023