Barmouth Viaduct Demolition

We were approached by Pennys group to produce a complex floating solution to help their team cut up and demolish the historic Barmouth viaduct.

Levens Viaduct Restoration – Ulverston

GPS MACS, working on behalf of Story Contracting and Network Rail, required marine support with the Grade II listed* Levens Viaduct in Ulverston. The viaduct, originally built in 1857, comprises 49 similar spans, with the piers constructed on a concrete apron which required extensive restoration

Scour Protection – Camarthen, Wales

Northern Divers required a self-propelled pontoon with a Hiab crane to support the installation of 14 x 700kg rock bags to provide scour protection to an exposed pipeline in the River Towy near Carmarthen.  

Floating Bridge Lift – Penwhapple

Beaver Bridges asked us to assist with the replacement of a footbridge at Penwhapple Reservoir in Scotland, and to install a temporary pontoon walkway for access.

Scaff Barge – Guildford

We mobilised 8m x 4m pontoon with over 3.5t payload capacity to carry materials and give access to a remote bridge on the River Tillingbourne.

Equipment Transport – Cornwall

As part of a planned redevelopment of the southern shore of the lake (which is only accessible by water) the CST needed to transport approx. 50 tonnes of plant, machinery, and building materials across the lake.

Ferry Ramp Installation

A&P Docks in Falmouth wanted a solution to install new ramps to the Stena Europe who was alongside for an extensive on the water refit.

Dredging Pontoon

Lutra Marine Limited requested a pontoon suitable for a 9t WM long reach excavator for dredging on the canal in Bude with their innovative new cutter head.

Falmouth Boat Yard – Boat Hoist

Falmouth Boat yard boat hoist was taken out of service at one of their busiest times of year but another local yard offered them the use of their hoist.

Hamms Hall Bridge Demolition

AR Demolition requested a suitable and safe pontoon for heavy equipment to operate on over water to help with the demolition of a bridge over the River Tame.

Brownhill lock

We designed a 16x3.7m ScaffFloat Barge to transport 15t of scaffolding to a remote lock site so a civil engineering firm could carry out maintenance works.

ScaffFloat Drydock

Using the ScaffFloat system to develop a dry dock to lift vessels and other heavy items up from the seabed and/or out of the water.